|
|
 |
|
|
|
CAIP goes IP (Dec 2008) |
| |
|
CAIP have been asked to provide Ethernet trial services on a
handful of existing sites for a network operator and their
equipment vendor partner. |
| |
|
The works were not without there problems to solve but we
are pleased to announce the successful conclusion of the
trial and we await the role-out starting 2nd
quarter 09. |
| |
|
CAIP offers a diverse range of services to its customers on
microwave and jumpering related projects. CAIP's in
house professionals can perform "cradle to grave" functions
on a wide aspect of telecoms projects. |
|
^ Back to Top |
 |
|
|
|
Design and Build (Nov 2008) |
| |
|
CAIP have been awarded a large Design and Build contract for
a blue chip telecoms operator. The works will be to
provide telecoms infrastructure throughout the UK and is
expected to commence in early 09. |
| |
|
CAIP has acquisition, design and build experience on
thousands of telecommunications sites which will be called
upon to deliver this project to the customer. |
|
^ Back to Top |
 |
|
|
|
Microwave Maintenance (Oct 2008) |
| |
|
CAIP have been awarded a large project of work to undertake
a planned maintenance programme on a microwave network in
Scotland. |
| |
|
The works require the replacement of high level microwave
parts that have become worn and are underperforming due to
weather corrosion. CAIP's diverse range of services
allow us to offer customers a one stop shop for all their
needs. |
|
^ Back to Top |
 |
|
|
|
Lead Role Appointment (Sep 2008) |
| |
|
CAIP are pleased to announce the appointment of Peter
Asquith – Construction Director. Peter will now lead
CAIP's Construction division and will be attacking the fit
out, refurbishment, telecoms and general construction
markets. |
| |
|
Paul Ryan CAIP MD said "I am delighted we have managed to
attract an Operations Director of the calibre of Peter to
lead our Construction Services Division. He brings
with him a wealth of experience in many sectors of the
industry and will help us develop new opportunities.
Peter has a passion for Quality Delivery and Customer Focus
and so is ideally suited to deliver our objectives.
This appointment will enable us to identify and exploit new
opportunities for our Construction Services Division and
maximise our capabilities under one structure." |
|
^ Back to Top |
 |
|
|
|
Falklands Export!! (Aug 2008) |
| |
|
CAIP have been requested to support a long term customer
from a distance, sending a shipment of ancillary tower steel
parts some 7000 miles across the Atlantic Ocean to the
Falklands Islands. |
| |
|
Ian Brooks sales Director at CAIP said "This instruction
resulted from CAIP's high levels of performance on previous
projects with this customer where our proven ability to
deliver a quality product under difficult circumstances,
tight deadlines and to a tight budget demonstrated our
commitment to customer satisfaction". |
|
^ Back to Top |
 |
|
|
|
Mobile gets Faster (Jul 2008) |
| |
|
CAIP have been awarded a 3g expansion project by large blue chip
telecoms customers. In readiness for the increased
bandwidth expected from mobile devices, this project of work
involves works to thousands of sites across the UK in a
planned programme to increase the traffic capacity of the
existing cell. |
|
^ Back to Top |
 |
|
|
|
Database Embedded (Jun 2008) |
| |
|
CAIP introduce their PIMS (Project Information and
Management System) database to the whole UK operation. |
| |
|
The database which unifies accounts, stock tracking and
operations is a bespoke piece of software that has been 1
year in the planning and development stage. |
| |
|
A huge thank you to Russell Smith for his time and patience
with development and implementation of the whole scheme. |
|
^ Back to Top |
 |
| |
|
Large In-Building Solution (May 2008) |
| |
| CAIP has been awarded a flagship In-Building equipment
supply and turnkey design and installation project for a
large UK airport. |
| |
| The work covers all terminals for the combined 2g and 3g
system with a requirement for built in upgradeability for
emerging technology. |
| |
| CAIP's proposal was chosen over 5 other prospective bids. The works are expected to be concluded within 2008 and CAIP
will provide ongoing support and maintenance for up to 9
years. |
|
^ Back to Top |
 |
| |
|
Estates and Professional (Apr 2008) |
| |
| CAIP have been awarded a contract from a Blue Chip Client to
provide negotiation, planning and design works on their
active network. |
| |
| The contract is expected to require the handling of many
thousands of sites and should be concluded within 2 years. |
|
^ Back to Top |
 |
| |
|
Turn off Terrestrial (Mar 2008) |
| |
| CAIP has been awarded a large contract by a blue chip client
for the provision of building and internal fit-out services
required as a result of the expansion and requirement to
move terrestrial broadcast from its existing frequency. |
|
^ Back to Top |
 |
| |
|
Mast Redevelopment (Feb 2008) |
| |
| CAIP have been awarded a package of works for mast
redevelopment for a blue chip client. |
| |
| The works require the construction of a new mast and rigging
for multiple operators and the decommission of an adjacent
temporary mast for which planning has expired. |
|
^ Back to Top |
 |
| |
|
Tower Strengthen (Jan 2008) |
| |
|
CAIP awarded tower strengthening projects by Blue Chip
Client. |
|
|
|
The works requiring co-ordination of craneage and heavy
derricks, steel work design and fabrication and heavy
rigging are being undertaken as part of an expansion in
demand for wireless infrastructure. |
|
^ Back to Top |